Projects
Ongoing Projects
SL. No. | Name of the contract specifying scope, voltage, capacity and location | Total contract value | ||
(INR Cr) | Client | Completion date | ||
1 | Tower Package TW08 including Tower, Conductor, insulators, OPGW (Installation and Commissioning only), hardware fitting and accessories for conductor for :- (i) 132kV S/C on D/C Tower Sagali-Naharlagun Trans under “Comprehensive Scheme for Strengthening of Transmission & Distribution System in NER & Sikkim : Intra-State : Arunachal Pradesh.” Specification No.: CC-CS/165-NER/TW-3523/3/G1(TW08) | 28.91 | Power Grid Corporation of India, Gurgaon | 14-Jul-19 |
2 | Construction/ Supply of Engineering, Supply of Materials/Equipments, Erection, Testing and Commissioning of LILO of one circuit of 220 KV D/C, 3-Phase, TTPS – Govindpur Transmission Line on turnkey basis (Approx.: 35 KM) NIT No. 87/PR/JUSNL/2016-17 | 21.43 | Jharkhand Urja Sancharan Nigam Ltd., Ranchi | 11-Jul-18 |
3 | Construction of 132 KV railway transmission line from 132/33 KV GSS Nalanda to upcoming TSS Nalanda (approx 06KM) & Construction of 01 no. dedicated 132 KV line bay at 132/33 KV GSS Nalanda. Nit No. 04/PR/BSPTCL/2017 | 3.89 | Bihar State Power Transmission Company Ltd., Patna | 10-Jun-18 |
4 | Construction of 132 KV D/C Transmission line with ACSR Panther conductor between 132/33 KV Ramnagar (Darbhanga) Grid Sub Station and 132/33 KV Chandanpatti (Gangwara) Grid Sub Station (Approx Route Length- 10 KM) against NIT No. 18/PR/BSPTCL/2015, under special plan (BRGF) Phase-III, part-I Scheme on turnkey basis | 9.84 | Bihar State Power Transmission Company Ltd., Patna | 31-Mar-18 |
5 | Design, Engineering, Supply of materials/ equipments, Erection, Testing & Commissioning of 132 kV Bays at TSS Nagar Untari along with Engineering, Supply, Erection, Testing & Commissioning of LILO from Circuit -I on 132 kV Rihand - Sonenagar tie transmission line for availing power at 132/25 kV upcoming Railway Traction Sub-Station at Nagar Untari in Jharkhand State on turnkey basis NIT No. 118/PR/JUSNL/2016-17 | 9.81 | Jharkhand Urja Sancharan Nigam Ltd., Ranchi | |
6 | Construction of 03(three) Nos. of 132/33 KV Transformer bays at GSS Sasaram, Bikramganj and Banjari under Special Plan (BRGF) scheme of Phase-III part-II, (N-1) compliance on turnkey basis (Supply Portion), against NIT No.09/PR/BSPTCL/2014. | 7.35 | Bihar State Power Transmission Company Ltd., Patna | |
7 | Construction of Loop In Loop Out arrangement of 132 KV S/C Madhepura-Sonebarsa Transmission line on D/C Tower at Saharsa Existing (CKM-40 KM) under Special Plan of Phase-III on turnkey basis against NIT No. 38/PR/BSPTCL/2014. | 16.81 | Bihar State Power Transmission Company Ltd., Patna | |
8 | Construction of 132 KV D/C Sonenagar (New) – Aurangabad transmission line RL- 22 KM with OPGW under State plan against NIT No. 59/PR/BSPTCL/2014 Package- ‘B’. | 15.89 | Bihar State Power Transmission Company Ltd., Patna | |
9 | Relocation/Rerouting of 132 KV D/C Transmission Line (Sonenagar-Garhwa-Rihand) along with height raising work at two places from location no. 30 to 48 on turnkey basis (Approx line length- 10 CKM) on turnkey basis under Deposit Work of Nabinagar Power Generating Company Pvt. Ltd. NIT No. 46/PR/BSPTCL/2015. | 6.18 | Bihar State Power Transmission Company Ltd., Patna |